Section 2 – Installation Qualification (IQ)
Initial Qualification and Requalification
The IQ protocols described below are dedicated to initial qualification and/or to requalification. Instal-
lation Qualification tests should be performed, 1) when the system is installed, 2) when the system is
moved to a new location, 3) prior to running OQ tests.
This section describes the procedure for receiving, unpacking, and installing a Series 4 AquaLab
Water Activity instrument.
The purchased AquaLab Water Activity instrument undergoing qualification is located at:
Company Name:
Department:
Address:
City: State:
Country:
Zip code/Postal Code:
Phone Number:
2.1 Equipment identification
Fill out this section after unpacking the AquaLab instrument and corresponding accessories.
4 4TE 4TEV 4TE DUO 4TEV DUO
Manufacturer: DECAGON DEVICES
Model Number:
Serial Number:
Decagon Devices Authorized Representative
Name:
Date:
Signature:
Initials:
2.2 Receiving and Unpacking
Verify that the external packaging was not damaged during shipment in a way that the internal package
content might be damaged.
External package condition
Satisfactory
Not Satisfactory
Remarks: N/A