14
KD2 Pro Operator’s Manual
2. KD2 Pro Overview
If measurements need to be made in concrete that has already
been cured, holes can be drilled into the sample using the pro-
cedure outlined above in the section titled “Installing the Sen-
sors.”
Measurements In Insulation
Insulation measurements are best made with the KS-1 probe
using a 10 minute read time. The long read time minimizes
contact resistance errors, and the low heat of the KS-1 needle
reduces free convection errors. In foam insulation a hole
should be drilled for the probe. Simply pushing in the needle
can cause the insulation to bunch in front of the needle tip
resulting in a poor fit and a consequently a faulty reading. In
fiber type insulation materials, assure that the insulating mate-
rials are not unduly disturbed by the needle insertion. (i.e.
pushed in front of the needle tip). Do not allow the probe to
move during the measurement.