7 Initial operation
Preparation:
Previous to the assembly of the personnel lock:
Determine the exact position and the ground plan
The ground has to be flat and clean
Assembly:
Put the bottom elements straight ahead from each other and place the grates.
In case of unevenness of the space, at least 2 squared timbers of a minimal cross
section of 10 cm x 10 cm should be placed underneath the total length and aligned.
Note:
The sewage water connection of the shower cabin should have the shortest way to the
water treatment device, in order to avoid needless lengths of hoses or cables. The
mounting brackets of the base tube have to be cleaned before the insert of the door and
wall elements!
load capacity of single floor element: max. 150 kg
Insert the corner profile in the connection corner of two bottoms and tense the quick
clamping fixture situated at the end of the corner profile with the bottom.