5 Operation
5.1
General
Once the indoor module has been connected to the boiler, the unit is
managed from the boiler control panel. No action need be taken directly
on the indoor module.
The boiler control panel:
displays every item of information on the hybrid heat pump as a whole
(indoor module, boiler and outdoor unit)
displays the PCB on which a parameter has to be set:
Heat pump control system PCB (EHC-02)
PCB for managing the second circuit (SCB-04)
is used to make the settings required for the hybrid heat pump to run.
5.2
Use of the control panel
5.2.1
Browsing in the menus
Press any key to turn on the backlight for the control panel screen.
If no key is pressed within 3 minutes, the control panel backlight will go
out.
Press the 2 right-hand keys together to access the different menus:
Tab.15 Menus available
Information menu
User menu
Installer menu
Manual Forcing menu
Malfunction menu
COUNTERS sub-menu
TIME PROG sub-menu
CLOCK sub-menu
PCB selection menu
Important
The icon is displayed only if an optional PCB has
been installed.
Important
The different menus are only accessible when the icons flash.
Press the key to:
access the next menu,
access the next sub-menu,
access the next parameter,
increase the value.
Press the key to:
access the previous menu,
access the previous sub-menu,
access the previous parameter
decrease the value.
Press the confirmation key
to confirm:
a menu,
a sub-menu,
a parameter,
a value.