5.8.2
Connecting the back-up authorisation - X7 connector
(TWH 300 EH model)
Fig.17
C003618-C
Backup
1. Remove the front cover.
2. Access the PCB.
3. Connect the Boiler backup connector (boiler back-up).
See
To set the boiler input, refer to the boiler instruction manual.
5.8.3
Accessing the peak rate/off-peak rate connection
terminal block
1. Unscrew the two screws.
2. Remove the front cover.
Fig.18
MW-1000368-1
1
1
1
2
5 Installation
300026515 - v10 - 28082018
29