5.8.6
Connection with timer programming and photovoltaic
signal
Fig.23
MW-
3000639-1
A
TEST
16 A
40 A
2 A
30
mA
L
N
X11-2 HP/H
PV-S
DC
AC
X11-1 LINE
C
3
5
6
4
4
3 AC-type differential switch
4 Circuit breaker
5 Photovoltaic panel
6 Photovoltaic inverter
A 230 V voltage cable, 1.5 mm
2
1. The heat pump and the electrical back-up are authorised to operate
according to the timer programming.
2. When the photovoltaic signal is active, the tank set point is 62 °C, and
can be adjusted via the
parameter.
3. If the photovoltaic signal is active when the contact is open, set the
parameter to 3.
4. If the photovoltaic signal is active when the contact is closed, set the
parameter to 4.
5 Installation
300026515 - v10 - 28082018