MCA
Pro
45/65/90/115
MCA-Pro ISM Rv.4.1 2/2017
18
4. Installation
4.1 Regulations governing installation
WARNING
Installation of the boiler must be done by a qualified
professional in accordance with prevailing local and
national regulations. The professional must comply
with local/national requirements.
4.2 Package list
4.2.1. Standard delivery
•
The boiler is fitted with a 3-prong power supply
cable/plug
•
Power cable for pump
•
Mounting rail and mounting accessories for wall
mounting
•
Wall mount template
•
Connection kit accessory with separate assembly
instructions
•
Installation and Service Manual
•
User Guide
•
3 tubes of X100 water treatment
•
Outdoor sensor
These installation and maintenance instructions deal
only with the items included in a standard delivery. For
installation and assembly of any accessories supplied
with the boiler, see the relevant installation/assembly
instructions.
4.2.2. Accessories/Options
Description
Pipe vent adapter 80/125 (MCA Pro 45)
Pipe vent adapter 100/150 (MCA Pro 65/90/115)
DHW sensor
IF-01 control PCB
SCU-S02 control PCB
Heat exchanger cleaning tool
Maintenance set A, B, C
Floor stand
Summary of Contents for MCA Pro 115
Page 45: ...45 MCA Pro 45 65 90 115 MCA Pro ISM Rv 4 1 2 2017 4 Installation H D G C B A E I J F ...
Page 117: ......
Page 118: ......
Page 119: ......