4.6.2 Connection of the heating circuit
The boiler is supplied with the following NPT type
threaded components which include:
1¼”x 1¼”x ½” NPT black iron malleable TEE fitting
1
1¼”x 1¼”x ¾” NPT black iron malleable TEE fitting
1
1¼” NPT x 4 inch long black iron nipple
1
1¼” NPT x 1 inch close black iron nipple
1
¾” NPT black iron 90° street elbow
2
Watts PRV, 30 psig, model M3351M1 or Conbraco
1
Watts 2½” Temp. Pressure gauge, ½” DPTG3-2.5
1
⅜" by 3 inch long lag bolts
2
⅜" x 1 ¾” inches long lag shield
2
⅜" flat washer
2
1¼" Brass union
1
¾” NPT black iron malleable tee fitting
1
Note:
All components must be installed onto the boiler
BEFORE the boiler is to be installed onto the wall
bracket.
Installation procedure for water connection kit
Step 1
Remove the anti-dust plugs supplied with
boilers, some water may come out of the boiler
(from factory testing of boiler)
Step 2
Lay the boiler on its side and use cardboard
under the boiler to prevent scratching of the
boiler casing surface
Step 3
Remove all fittings from the components box
supplied, and add pipe dope to all male threads,
including the 1
¼
”
NPT inlet and 1
¼
”
NPT outlet
threads on the boiler
Step 4
Use a chain pipe wrench on the 1
¼
”
NPT outlet
side and install male side of the 1
¼
”
NPT brass
union. Be careful not to apply torque onto
the 1
¼
”
NPT brass union without a chain pipe
wrench on the 1
¼”
NPT outlet pipe as this could
cause the boiler casing to distort.
Step 5
Using a pipe vise, attach the female side of the
brass union to one end of the 1
¼
”
NPT x 6” long
pipe nipple, and attach the 1
¼
”
X 1
¼
” X
¾
” NPT
tee to opposite end of 1
1/4”
NPT nipple
Step 6
Install a close nipple onto the 1
¼
”
x 2" x
½
”
inch NPT tee to bottom of the assembly
Step 7
Install
¾
” street elbows in
¾
” inch portion of
the assembly, ensure the street elbow is facing
upwards.
Step 8
Install supplied
¾
” brass pressure relief valve
Model M3351 in street elbow. Ensure the
pressure relief valve is facing outwards
4. Installation
DANGER
NEVER INSTALL A PRESSURE RELIEF VALVE THAT IS
RATED HIGHER THAN 56 PSIG / 3.9 BAR, as severe
personnel injury or death can occur.
Step 9
Install the remaining ¾” street elbow into the
outlet port of the pressure relief valve, ensure
this
¾"
NPT street elbow is facing downwards
Step 10
Install the supplied temperature and pressure
gauge in the ½” NPT port of the bottom 1
¼
”
x 1
¾
"
X½” NPT tee fitting
Step 11
Install the pipe assembly onto the boiler by
tightening the brass 1¼” NPT union
Step 12
Install the siphon container onto the boiler
Now the boiler is ready to be installed onto the wall
bracket, please ensure two people handle the boiler
and carefully place the assembled boiler onto the wall
bracket.
After the boiler is installed onto the wall bracket, use a
water level to ensure the boiler is level in all planes.
1 1/4x1 1/4x1/2NPT
Tee Fitting
3/4x 3 Tee
Fitting GAS
1/2NPT Temp/Pressure
Gauge Model DPTG
1 1/4x1 1/4x3/4NPT
Tee Fitting
PRV,30PSI,
M3351
3/4NPT Black
Iron Street Elbow
1 1/4 Niple,4"long
Brass 1 1/4
Union
1 1/4 Close Nipple
5/8 diameter x 1 3/4"L la
gs
3/8x3"L Lag Bolt