3
6.
Connection of HVI
Conductors to an isolated ring conductor ................................. 33
7.
Installation of HVI
Conductors integrated in the supporting tube
(3.2 m long) in a tripod .............................................................................................. 34
8.
Conductor installation ............................................................................................... 36
8.1
Additional connection of the external cable sheath for equipotential bonding ....... 36
8.2
Wind load ................................................................................................................... 37
9.
Checklist for installing HVI Conductors ..................................................................... 39