If a mix is sticking to the hopper a causing a ‘tunnelling’ effect a knockdown paddle can be
supplied to release the product from the hopper and push it into the path of the pressure
paddles.
If, in the unlikely event, problems still occur in filling and forming it may be necessary to
modify the mix slightly to achieve the desired results.
Note: The scraper wire should be kept as clean as possible to aid the release of the product
from the drum. The manual cleaning of the wire and wire scrapers should be carried out
regularly during production.