Service
DeLaval milking point controller MPCII
94381001.pdf
2006-07-20
DeLaval milking point
controller MPCII
Service
Change of MPCII to a MPCII
1. First, change the connections in the back
of the MPCII.
-
Make sure the bus is connected to
terminal alcom 1, and not alcom 2.
-
Exchange the 12V AC terminal from a
four connectors to a two.
Left side gate
connection
Right side gate
connection
-
An MPCII with gate function must have
the gate wires connected as shown in the
diagram below.
-
Check pulsator connections.
2. The MPCII can hold two application
programs, one of them to be used as
back-up.
The card file name contains a number one
or number two for the two pages, one or
two, where the application program is to be
filed. Check the PMCII application program
version and operative program version by
entering F 96 and password. Toggle
between page 1 and 2 log with the enter
key ↑.
3. Download the application program.
The application program must be
downloaded using the ALPRO processor
(version 6.30 or higher) and a program card.
This procedure is described in chapter
ALPRO System ver 6.30/Milking, Service.
91(94)
Summary of Contents for MPCII
Page 1: ...MEMO Internal use DeLaval milking point controller MPCII 2006 07 20 0605 94381001 pdf ...
Page 2: ......
Page 13: ...Installation MPCII AlfaDast 94381001 pdf 2006 07 20 MPCII AlfaDast Installation 5 94 ...
Page 16: ...Installation MPCII AlfaDast 94381001 pdf 2006 07 20 8 94 ...
Page 26: ...Installation MPCII herringbone 94381001 pdf 2006 07 20 18 94 ...
Page 30: ...Installation MPCII In parlour feeding 94381001 pdf 2006 07 20 22 94 ...
Page 36: ...Installation MPCII MidiLine 94381001 pdf 2006 07 20 28 94 ...
Page 46: ...Installation MPCII Tandem 94381001 pdf 2006 07 20 38 94 ...
Page 102: ...Troubleshooting DeLaval milking point controller MPCII 94381001 pdf 2006 07 20 94 94 ...