background image

Short Form Specifications

Top

is constructed of one-piece 16-gauge stainless steel, with integral 2.12”

(5.4 cm) square nosing on front and 10.4” (26.3 cm)  full length raised
refrigerated syrup rail. Refrigerated rail is furnished with syrup pumps,
chocolate pump and fruit jars. Top to be insulated and have raised rim open-
ing(s) provided with cover. Cover(s) are insulated, folding and removable.

Interior

is constructed of 22-gauge stainless steel. Liner is insulated with 2.5”

(6.4 cm) foamed-in-place polyurethane. Unit has a cold wall refrigeration sys-
tem and is supplied with a low pressure control for the tank and an evaporator
pressure regulating valve for the rail. Unit is designed to maintain 0°F  (-18°C)
to 5° F (-15°C) in the tank and 33°F (1°C) to 40°F (4°C) in the rail.

Exterior front

has 22-gauge stainless steel front panel(s). Exterior ends

are constructed of 18-gauge galvanized steel. Unit has condensing unit on
right end of cabinet and wired with cord and plug. Housing for condens-
ing unit has a louvered front panel.

Electrical connections

are 115 volt, 60 Hertz, single phase.

Unit is mounted on on 6.13” (15.6 cm) high adjustable stainless steel legs.

Optional Accessories and Modifications

505B

Stainless steel back

906A

Stainless steel end

505F

Laminate facing

505A

Laminate back

906E

Laminate end

717M

Sink and dipperwell (consult factory)

717N

Dipperwell 

717O

Sink (consult factory)

120F

Drain with gate valve for rail

213

*220V/50 cycle electrical

*Inclusion of this option will alter 

electrical specifications.

®

Built to NSF7 standards.

Model F13BC56

31.5” (80cm) Deep Self-Contained Low Temp, Ice Cream Cabinets with Syrup Rail

The Delfield Company, P.O. Box 470, Mt Pleasant, MI 48804-0470, U.S.A. • (800) 733-8821 • Fax (800) 669-0619 • www.delfield.com

Delfield reserves the right to make changes in design or specifications without prior notice. ©2001 The Delfield Company. All rights reserved. Printed in U.S.A. 

PROJECT

ITEM #

QUANTITY

DATE

APPROVAL

F13BC

Reviews: