Figure 73. Installing the M.2 BOSS card
Next steps
1
2
Follow the procedure listed in the
After working inside your sled
Mezzanine card
Your system supports two mezzanine cards:
•
PCIe mezzanine card slot A supports fabric A. This card must match the fabric type of I/O modules installed in I/O module bays A1.
•
PCIe mezzanine card slot B supports fabric B. This card must match the fabric type of I/O modules installed in I/O module bays B1.
NOTE:
The Mezzanine B1 card requires processor 2 to be installed.
Removing the Mezzanine card
Prerequisites
1
Follow the safety guidelines listed in
.
2
Follow the procedure listed in
Before working inside the sled
Steps
1
Use the Phillips #2 screwdriver, loosen the captive screws that secure the Mezzanine card to the system.
2
Lift the Mezzanine card out of the sled.
NOTE:
To prevent damage to Mezzanine card, you must hold the card only by its edges.
100
Installing and removing system components