N2200-ON Series switch installation
To install the N2200-ON Series switch, complete the installation procedures in the order that is presented in this chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the N2200-ON Series switch and components. As with all electrical devices of this type, take all the
necessary safety precautions to prevent injury when installing this switch.
Topics:
•
•
Rack or cabinet hardware installation
•
•
•
Two-post five-inch-offset switch installation
•
Two-post flush-mount switch installation
•
Wall- or ceiling-mount switch installation
•
One RU ReadyRails installation
•
•
•
•
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the switch, ensure that the following items are included:
•
One N2200-ON Series switch
•
One RJ45 to DB-9 female cable
•
One MicroUSB console cable
•
One set of rack mounting brackets and screws
•
Four rubber feet
•
One pluggable AC PSU (and second AC PSU if ordered)
•
One or two pluggable DC PSUs (if ordered)
•
Two or three pluggable fan units, depending on the switch model
•
One AC power cable, country or region specific
•
DC only: DC power cables
•
N2200-ON Series Quick Setup Guide
•
N2200-ON Series Warnings Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
Unpacking Steps
Unpack the system carefully.
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container, or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
4
20
N2200-ON Series switch installation