-
11
-
3. Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Screw-driver
3) Glove
4) Cleaning cloth
ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Assemble G-
SYNC+HeatSink Module
with I/F BD and fix it by
screw*4
2. Insert Fan Cable into I/F
BD
Screw
driver
(S
crew
Torque:
4.0±0.5 kgf)
2
1.
Insert SPS BD wire into
SPS BD and assemble
SPS BD in Main SHD
2.
Insert wire to connect I/F
BD and SPS BD
3.
Insert I/F BD to Docking
BD wire into I/F BD
Screw
driver
(Screw
Torque:
8.5±1kgf)
Do not
touch the
component
without
wearing
insulating
gloves
when
disassembli
ng and
assembling
Power BD