Installation procedure for 2x GbE LAN uFM
module
About this task
Installation requires the removal of WiFi, as well as COM3 and COM4 ports. The 4-port COM cable will be replaced with an
included dual-port COM cable.
Table 9. Expansion module packing list
Item
Quantity
Notes
Screw M3 x 6L
2
Torque required: 4.0 kgf.cm
Screw M3 x 4L
14
Torque required: 4.0 kgf.cm
Screw M3 x 5L
1
Torque required: 4.0 kgf.cm
Standoff H4
4
Torque required: 4.5 kgf.cm
Nut M3
4
Torque required: 4.0 kgf.cm
Screw M2.5 x 6L
2
Torque required: 3.0 kgf.cm
Cable tie
2
-
Rubber cap
2
-
Cable clip
1
-
Sheet metal I/O panel
1
-
Bracket
1
-
LAN PCBA
1
-
LAN mPCIe
1
-
Dual-port COM cable
1
-
LAN cable
2
-
Steps
1. Remove the eight screws from the bottom panel of the EGW-5200, as shown in the following figure, and remove the bottom
panel.
V
38
Installation procedure for 2x GbE LAN uFM module