Figure 56. Installing the mezzanine card bridge board
Next steps
1
Install the mezzanine card.
2
Install the expansion card riser assembly.
3
Install the sled into the enclosure.
4
Follow the procedure listed in
After working inside your system
.
Related link
Installing a mezzanine card
Installing the expansion card riser assembly
Installing a sled
Removing the OCP card
Prerequisites
NOTE:
The procedure to remove the mezzanine blank is similar to the removal of a mezzanine card.
1
Follow the safety guidelines listed in
2
Follow the procedure listed in
Before working inside your system
.
3
Remove the sled from the enclosure.
4
Remove the mezzanine card.
Steps
1
Push the blue retention clips away on one side and release the Open Compute Project (OCP) card.
Repeat step 1 to release the card from the clips on the other side.
2
Slide the card toward the front of the sled to disengage the connectors from the chassis and lift the card up.
Installing and removing system components
111
Summary of Contents for EMC PowerEdge C6420
Page 1: ...Dell EMC PowerEdge C6420 Regulatory Model E43S Series Regulatory Type E43S001 ...
Page 8: ...Figure 1 Supported configurations for PowerEdge C6420 8 PowerEdge C6420 overview ...
Page 64: ...Figure 12 Removing a sled 64 Installing and removing system components ...
Page 66: ...Figure 14 Installing a sled 66 Installing and removing system components ...