2
Follow the procedure listed in
Before working inside your system
.
3
Remove the sled from the enclosure.
4
Remove the air shroud.
Steps
1
Pull the blue pull tab on the locking bar up to release the connector from the lock on the processor base plate.
2
To disengage and release the fabric connector, pull the connector away from the processor.
3
Pressing the connector clips, release the side band cable from the connector and lift the cable away.
Figure 39. Removing the fabric and sideband cables
Next step
Install the fabric and sideband cables.
Related link
Removing a sled
Removing the air shroud
Installing the fabric and sideband cables
Installing the fabric and sideband cables
Prerequisites
NOTE:
In a sled which has been configured with mixed CPUs – a fabric processor installed in the CPU2 socket and a non-fabric
processor installed in the CPU1 socket, you must connect the external Omnipath link cables to Port 2 on the OCP carrier card.
NOTE:
The procedure to install the carrier card is similar to installing an OCP card.
NOTE:
Route the fabric cable for CPU2 under the heat sink of CPU1.
Follow the safety guidelines listed in
Installing and removing system components
91
Summary of Contents for EMC PowerEdge C6420
Page 1: ...Dell EMC PowerEdge C6420 Regulatory Model E43S Series Regulatory Type E43S001 ...
Page 8: ...Figure 1 Supported configurations for PowerEdge C6420 8 PowerEdge C6420 overview ...
Page 64: ...Figure 12 Removing a sled 64 Installing and removing system components ...
Page 66: ...Figure 14 Installing a sled 66 Installing and removing system components ...