Getting Started Guide
37
Figure 1-9. Two Redundant Power Supplies on N3132PX-ON
AC and DC Power Connection
1
Make sure that the switch console port is connected to a VT100 terminal
or VT100 terminal emulator via the RJ-45 to DB-9 female cable.
2
Using a 5-foot (1.5 m) standard power cable with safety ground connected,
connect the power cable to the AC main receptacle located on the rear
panel.
3
Connect the power cable to a grounded AC outlet.
Booting the N3132PX-ON Switch
When the power is turned on with the local terminal already connected, the
switch goes through a power-on self-test (POST). POST runs every time the
switch is initialized and checks hardware components to determine if the
switch is fully operational before completely booting. If POST detects a
critical problem, the program flow stops. If POST passes successfully, valid
firmware is loaded into RAM. POST messages are displayed on the terminal
and indicate test success or failure. The boot process runs for approximately
60 seconds.
You can invoke the
Boot
menu after the first part of the POST is completed.
From the
Boot
menu, you can perform configuration tasks such as resetting
the system to factory defaults, activating the backup image, or recovering a
password. For more information about the
Boot
menu functions, refer to the
CLI Reference Guide
.
To AC Power Source
Summary of Contents for N2128PX-ON
Page 2: ......
Page 8: ...6 Contents ...
Page 50: ...48 Getting Started Guide ...
Page 56: ...54 Table des matières ...
Page 104: ...102 Índice ...
Page 156: ...154 Contenido ...