Site Location and Preparation
|
17
3
Site Location and Preparation
The S6000 is suitable for installation as part of a common bond network (CBN). It can be installed in:
•
Network telecommunication facilities
•
Data centers
•
Other locations where the national electric code (NEC) applies
This chapter contains the following sections regarding where and how you should install the S6000:
•
Site Selection
•
Cabinet Placement
•
Rack Mount
•
Ground
•
Fans and Airflow
•
Power
•
Storing Components
NOTE:
Install the S6000 system into a rack or cabinet before installing any optional components.
Summary of Contents for Networking S6000 System
Page 1: ...Dell Networking S6000 Installation Guide Publication Date October 2013 ...
Page 6: ...6 w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 8: ...8 About this Guide w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 16: ...16 The S6000 System w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 42: ...42 Management Ports w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 50: ...50 Specifications w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 54: ...54 Technical Support w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 55: ......
Page 56: ...w w w d ell com support dell com Printed in the U S A ...