Change Determination Process | Change Management – ProScan
Change Determination Process
If you run the
Change Determination (CD) Process
, it collects all the configuration changes that
occurred on the target resources since the last time the CD process ran. It also associates these
changes with the date and time when the CD process runs. After running CD, you can then
produce a report (see
Compliance and Change Reporting on page 329
)
,
outlining all such changes
by date and time. This report comes seeded with installation.
Dell OpenManage Network Manager stores incremental changes as
RedcellConfigChangeRecords
by device/timestamp. The
ConfigChangeRecordsDAP
Database Aging Policy (DAP) manages how
long the OpenManage Network Manager database retains these records. This DAP’s default setting
stores incremental records for 30 days, then archives or purges them. Reporting shows only records
in the database; therefore, by default, the
Configuration Change Report
shows only resource
changes made in the last 30 days, but no older. Change this default by changing the number of days
to retain such records with the DAP.
The next section describes Change Determination Process Workflow.
Summary of Contents for OpenManage Network Manager
Page 1: ...Dell OpenManage Network Manager version 5 1 Web Client Guide ...
Page 14: ...14 A Note About Performance Preface ...
Page 98: ...98 Schedules Portal Conventions ...
Page 142: ...142 Vendors Key Portlets ...
Page 232: ...232 File Management File Servers ...
Page 242: ...242 Deploy Configuration ...
Page 290: ...290 Key Metric Editor Monitoring Metrics This panel s display depends on the selected device ...
Page 340: ...340 ...
Page 374: ...374 Adaptive CLI Records Archiving Policy Actions and Adaptive CLI ...
Page 380: ...380 Glossary ...
Page 388: ...388 388 Index ...