-
16
-
4
1. Assemble SPS BD Mylar to SPS
BD
5
1. Place panel on flat worktable with
panel surface facing down
2. Insert “FFC EDP cable” to panel
and paste 1 tape to fix it
3. Lock 5 screws to fix Main SHD
on panel
Philips-
head
screwdriver
Torsion of
screw:
4.5±0.5kg
6
1. Insert Control BD Wire to I/F BD
2. Insert the wires of Calibrator
Module
3. Arrange the wires of
CALIBRATOR Module and
adhere a tape to fix the wires
Summary of Contents for UP2720QB
Page 1: ...Simplified Service Manual UP2720QB Version 01 Date 2021 03 04 ...
Page 19: ... 19 5 Trouble shooting instructions ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 ...
Page 23: ... 23 ...
Page 24: ... 24 ...
Page 25: ... 25 ...
Page 26: ... 26 ...
Page 27: ... 27 ...
Page 28: ... 28 ...