Connection Systems
Delphi Connections Systems
Page 3 of 9
11/19/99
Note:
Assembly Instructions are provided for
reference
only, and are intended for use by skilled assembly technicians.
Personal injury, failure of the system to work as intended, and damage to the product may result from failure to follow the
assembly and disassembly techniques and/or use of tools other than those described. Always follow Assembly
Instructions thoroughly, and please contact Delphi Connection Systems for further assistance.
ASSEMBLY INSTRUCTIONS
280 GT SIDE LOCK COVER
CONNECTOR ASSEMBLY
NOTE 2
: SLC MUST NOT BE LOCKED INTO PLACE PRIOR TO PLUGGING LEADS
PLUG LEADS TO CONNECTOR ASSEMBLY PER PRINT.
STEP 1:
AFTER ALL LEADS ARE BUILT,
SEAT SIDE LOCK COVER (SLC). SEAT BY USING AN
ASSIST TOOL (REPAIR TOOL P/N’S AVAILABLE FROM
YOUR DELPHI ENGINEER). PLACE ASSIST TOOL ON
SLC AND EXERT PRESSURE UNTIL SLC SLIDES INTO
LOCKED POSITION.
STEP 3:
STEP 2:
BUILD (1) ONE CONNECTOR POSITION ASSURANCE
(CPA) TO CONNECTOR ASSEMBLY.
HOLD CONNECTOR ASSEMBLY PLUGGING SIDE
AWAY FROM HAND. HOLD CPA WITH
EXTENSIONS TOWARD CONNECTOR.
SLIDE EXTENSIONS INTO SLOTS AND SNAP
INTO PLACE USING FINGERS.
A.
.
B.