7
7
UNPACKING AND CLEANING
Carefully unpack the machine and all loose items from the shipping container(s). Remove the protective coating from
all unpainted surfaces. This coating may be removed with a soft cloth moistened with kerosene (do not use acetone,
gasoline or lacquer thinner for this purpose). After cleaning, cover the unpainted surfaces with a good quality household
floor paste wax.
CARTON CONTENTS
The DC-580, 20" planer is shipped complete in one container mounted to a shipping skid. Remove the wooden crate from around
the machine. The planer is shipped with the motor, motor pulleys and belts assembled to the machine. Fig. 2, illustrates the loose
items supplied with the machine.
A
B
C
D
E
F
G
H
Fig. 2
A. Cutterhead Guard
B. Dust Hood
C. M6 x 1 x 12mm Button Head Screws for fastening
the cover and dust hood to the machine (13)
D. Knife setting gage
E. Handwheel handle
F.
4mm T-handle wrench
G. M6 Allen wrench
H. 10 x 14mm open end wrench
ASSEMBLY
ASSEMBLY TOOLS REQUIRED
ASSEMBLY TIME ESTIMATE - 1-2 hours
* M6 Allen wrench (supplied)
* Flathead Screwdriver (Not Supplied
* Forklift and Lifting Straps For Set-Up (Not Supplied)