System Commissioning
DelREMO-V2.0 commissioning consists of starting up procedure and calibration of the system.
4.1 Steps involved in system commissioning
Following steps are involved in the commissioning procedure of the DelREMO-V2.0. Follow the stepwise
procedure to avoid any mistakes in the commissioning procedure.
4.1.1 System start up precautions
DelREMO-V2.0 works with 24V DC voltage, extra care should be taken while operating the system. Read
and follow precautions mentioned below carefully while starting up the commissioning of the system.
Ignorance of the precautions can cause serious loss to life or equipment.
4.1.2 Starting up procedure
Check all the wire connections for any damage or loose connections, before starting up procedure of
DelREMO-V2.0. Follow the below step wise procedure strictly for startup procedure of DelREMO-V2.0.
Step wise starting process will prevent probability of any mistake or missing any step.
Serial
no.
Steps for Startup precautions
Check
1
Check all wires again for any possible
loose or wrong connections prior to
commissioning.
2
Check AC supply to adapter unit is
switched to the “Off” position
3
Check the frame ground is properly
connected to a permanent earth ground
connection
4
Check all inverter modules are connecting
in daisy chained array.
5
Check SIM Card is inserted at SIM 1 slot
(If GSM/GPRS data mode to be used)
6
Check Antenna is connected to SMA
connector provided on body. (If
GSM/GPRS data mode to be used)
NOTE
ENSURE ALL TOOLS ARE PROPERLY INSULATED BEFORE USING THEM.
Serial
no.
Starting up procedure
Check
Summary of Contents for DelREMO-V2.0
Page 1: ...1 User Guide Indoor DelREMO V2 0 www deltaelectronicsindia com...
Page 2: ...2...
Page 18: ...18...
Page 44: ......
Page 45: ...Recycle paper Save earth...