36
InsightPower SNMP IPv6 for UPS
will delay the assigned OS Shutdown Delay time and wait for all operating
systems’ shutdown. After that, the SNMP IPv6 will send the assigned UPS
shutdown-delay command to the UPS and turn off the UPS.
z
z
Outlet Control
Press the Switch Bank button to control the UPS output relay (on or off).
z
z
Power Fail/ Restore Simulation
Click Power Fail Test or Power Restore Test button to let the SNMP IPv6
simulate UPS power failure or power restore event. This function allows you
to test all of the connected software and verify whether they work properly
or not. Please note that the simulation won’t influence UPS operation, the
UPS remains in its original operation mode and won’t transfer to battery
mode.
Weekly Schedule
Go to Device
→
Management
→
Weekly Schedule to arrange a weekly sched-
ule for the UPS. You can select No Action, Shutdown, Restart, 10-Second Test,
and set up what day and what time you want the action to be executed.
http://192.168.1.100/
Specific Schedule
Go to Device
→
Management
→
Specific Schedule to arrange a specific sched-
ule for the UPS. You can set up a specific date (MM/ DD/ YYYY) and time (hh:mm)
for a specific action (Stop Action, Shutdown, Restart, 10-Second Test and Deep
Battery Test).