INSTALL UPPER CABLE OVER FRONT PULLEY, BACK TO REAR PULLEY, DOWN
TO TOP PULLEY OF FLOATING PULLEY ASSEMBLY, UP TO STACK ASSEMBLY
PULLEY AND DOWN TO SELECTOR ROD ASSEMBLY. ATTACH 8MM SNAP HOOK
TO END OF CABLE AND THEN TO SELECTOR ROD BRACKET.
NOTE: UPPER CABLE IS SHORTER
THAN THE BOTTOM CABLE
UPPER CABLE INSTALLATION
UPPER PULLEY FRAME REMOVED
FOR CLARITY
FLOATING PULLEY
ASSEMBLY