THIS CHAIN ATTACHES BETWEEN THE END OF
THE CABLE AND THE MOUNTING FLANGE ON
THE FRONT SUPPORT. THE CHAIN ALLOWS FOR
CABLE LENGTH ADJUSTMENT
THIS CHAIN ATTACHES BETWEEN THE OTHER
END OF THE CABLE AND THE LOW ROW BAR.
CABLE INSTALLATION
NOTE: BOTH CABLES ARE THE
SAME LENGTH
STARTING WITH THE CABLE END WITHOUT THE BALL, INSTALL UPPER CABLE OVER
FRONT PULLEY, BACK TO MIDDLE PULLEY, DOWN TO TOP PULLEY OF FLOATING PULLEY
ASSEMBLY, UP TO REAR PULLEY AND DOWN TO WEIGHT CARRIAGE. ATTACH SNAP HOOK
TO END OF CABLE AND THEN TO WEIGHT CARRIAGE BRACKET. ATTACH SNAP HOOK TO
BALL END OF CABLE AND ATTACH LAT BAR.
STARTING WITH THE CABLE END WITHOUT THE BALL, INSTALL LOWER CABLE UNDER
FRONT PULLEY, BACK TO REAR PULLEY AND UP AND OVER LOWER PULLEY OF FLOATING
PULLEY ASSEMBLY. ATTACH SNAP HOOK TO END OF CABLE AND THEN TO ONE END OF
THE CHAIN. ATTACH SNAP HOOK TO THE OTHER END OF CHAIN AND THEN TO MOUNTING
FLANGE ON FRONT SUPPORT TUBE. ATTACH SNAP HOOK TO BALL END OF CABLE AND
ATTACH 10” CHAIN. ATTACH SNAP HOOK AND ROW BAR.