1. Getting acquainted with your High Pressure Cleaner
H-110-200E V00
Page 6
Operation Flow Diagram
1)
On/Off switch
Start and stop the machine by depressing this switch.
2)
Temperature Control
Adjust temperature by turning the knob.
3)
Chemical Suction Control
Adjust chemical suction by adjusting the knob.
4)
Pressure Gauge
5)
Boiler switch
Start and stop the boiler by depressing this switch.
Note: Chemical can only be dispense at low pressure
6)
Fuel Tank (Capacity : 18L)
Fill the fuel tank to the left side with automotive
quality Diesel.
Note: The Diesel Fuel tank must be filled with diesel
in order for the machine to operate as a hot water
cleaner.
1
2
3
4
5
Summary of Contents for H-110-200E
Page 20: ...4 Spare Part List H 110 200E V00 Page 19 Boiler assembly H 110 200E ...
Page 23: ...4 Spare Part List H 110 200E V00 Page 22 Pump assembly H 110E ...
Page 26: ...4 Spare Part List H 110 200E V00 Page 25 Pump assembly H 200E ...
Page 34: ...4 Spare Part List H 110 200E V00 Page 33 H 200E 220V 60Hz Standard ...