4
1.2
Mounting the Robot Unit
Caution (1) Before handling or installing the robot unit, be sure to read
SAFETY PRECAUTIONS, "Installation Precautions."
(2) The grease is applied to the shaft and rack of the Z-axis for
lubrication and rust-proof. Do no touch or wipe the shaft and
rack so as to keep rust-proof.
1.2.1
Transporting the Floor-Mount Type
This section gives the typical installation procedure assuming that you have set up the
robot mount bed and prepared robot mounting bolt holes in it. If you have not done it
yet, first read Section 1.2.3 "Securing the Robot Unit."
Caution (1) The installation jobs should be handled by at least two
persons.
Robot unit weight: Approx. 25 kg (55 lbs)
(2) Be sure to put on a helmet, safety shoes, and gloves.
Step 1
Disconnect the motor cable, encoder cable, air pipes, hand, and tools from the robot
unit, if mounted.
(Illustration: HS-G)
Disconnect the motor cable, encoder cable, and others.