Appendix E—Meter Installation Final Checklist
The following is a checklist to cover the majority of what needs to be considered or taken into account
when installing a DENT Instruments power meter. It is not intended to be all encompassing as every
scenario will be different.
Put an X in the check box when the checklist item has been addressed and add a comment where
required.
Checklist Item
Pass N/A Comment
Pictures: Outside of electrical room to aid in
locating electrical panel for next visit, inside
electrical room, picture of meter installed along
with CT installation and Voltage connection
Using ViewPoint, verify the PowerScout setup is correct
Are the CTs installed on the correct voltage phase?
Does the CT Type setting match the CT used?
Does the CT Amp setting match the CT used?
Does the CT Phase Shift match the table at bottom
of check list for the CT used (also included in the
manual)?
Verify measurements are correct
Are the Phase Chek LEDs green?
Are the currents and watt measurements
reasonable for the load (helps to verify the correct
load is monitored)?
Are the phase currents relativity close to each other
(within about 20%) on a load that should be
balanced?
For WYE loads, are the phase watts relativity close
to each other (within about 20%)?