www.deponti.com Assembly Manual
– Pinela Deluxe Pergola page
10
4.3.3 Exploded view pillar
Two module connector.
4.4 Delivery Inspection
Note:
Always carefully check the delivered items against the accompanying delivery note to ensure
that the quantity and quality are correct. Any visible defects must be reported in writing within 7
days of delivery.
Note:
• Boxes with red label: Electronic part
s like Control Unit Box, Remote Controls.
• Boxes with blue label: Metal parts like U Brackets, Mounting brackets, Pillar caps