background image

www.dero.com     |     1-888-337-6729

© 2018 Dero

CYCLE STATION

Installation Instructions

Install the purlins with (4) 3/8” x 5.5” bolts, (4) 
washers, (4) lock washers, and (4) nuts each.  Fully 
tighten all purlins.

For shelters with side panels, install the front 
and side panel supports between every upright, 
except where the door will be installed.  Align 
slots in the panel support with the slots in the 
upright, drill 3/8” diameter holes, and fasten with 
3/8” wedge anchors with nuts finger-tight.

For polycarbonate panels, install the panels 
with (4) 8mm bolts and (4) lock washers.  (2) 
130mm bolts on top and (2) 65mm bolts on the 
bottom.  The bolts will be received by square 
nuts that slide into the panel grooves.  The 
gap on top of the panel will be filled with (2) 
1.25” aluminum spacers and several washers if 
needed.  The uprights and panel supports may 
be slightly moved in order to get the panels as 
square as possible.

For wire mesh panels, install the panels with (4) 
5/16” bolts and (4) lock washers.  (2) 5.5” bolts 
on top and (2) 3” bolts on the bottom.  The bolts 
will be received by rivet nuts in the panels.  The 
gap on top of the panel will be filled with (2) 
1.25” aluminum spacers and several washers if 
needed. 

For shelters with Dero Decker racks, install 
the DD beams with (8) 5/8” x 2” carriage bolts, 
(8) lock washers, and (8) nuts each.  Leave 
finger-tight.  Carriage bolts at the end of the 
shelter should have the heads facing out.  See 
shelter assembly drawing for specific DD beam 
placement locations.

5

7

8

6

Summary of Contents for CYCLE STATION

Page 1: ... Door Polycarbonate Panel Wire Mesh Panel Dero Decker Beam Weldment Louver Front Louver Side Panel Support Front Weldment Panel Support Side Weldment Purlin Panel Weldment Purlin Weldment Truss Half 1 Weldment Truss Half 2 Weldment Type S Deck Upright Weldment Upright Dero Decker Weldments ...

Page 2: ... 2018 Dero www dero com 1 888 337 6729 CYCLE STATION Footing Details ...

Page 3: ...holes through the tube with 4 3 8 x 5 5 bolts 4 washers 4 lock washers and 4 nuts each Leave finger tight For shelters without side panels these purlins are the same as all other purlins Lift both truss halves into place and fasten to uprights with 4 x 4 5 bolts 4 lock washers and 4 nuts at each upright Leave finger tight Fasten truss halves to each other with 4 x 5 5 bolts 8 lock washers and 4 nu...

Page 4: ...d by square nuts that slide into the panel grooves The gap on top of the panel will be filled with 2 1 25 aluminum spacers and several washers if needed The uprights and panel supports may be slightly moved in order to get the panels as square as possible For wire mesh panels install the panels with 4 5 16 bolts and 4 lock washers 2 5 5 bolts on top and 2 3 bolts on the bottom The bolts will be re...

Page 5: ...e the second row of type S decks and fasten with 6 self drilling screws each Attach door with 4 hinges and 8 x 1 thread cutting screws each A 7 32 pilot hole will need to be drilled for each thread cutting screw Lubricate each thread cutting screw before installing The door bottom should be 4 5 off the ground and the door front should be flush with the uprights See individual product instructions ...

Page 6: ...o Install strike guard with 4 self drilling screws Door should close just enough to allow the latch to engage the strike See shelter assembly drawing for specific bike rack placement locations 13 14 CYCLE STATION Installation Instructions ...

Reviews: