MAINTENANCE
5-2
15 Jun 12
HyperPoolShaker
ROUTINE MAINTENANCE (CONT’D)
ROUTINE MAINTENANCE
Action
Frequency
Inspect entire machine for evidence of coating damage, including
exposed base metal, corrosion, deep scratches, or other voids. Repair
damaged areas in accordance with coating manufacturers’ specifications
(refer to Section 2).
Weekly
Lubricate AWD jack screw assembly using Dura-Lith EP, Mobilux EP, or
equivalent grease.
Quarterly
SCREEN FRAME
Suspended between the vertical legs of the hopper, the screen frame provides the mounting
surface for the screen panels and also includes mounting provisions for the vibrator motors and
screen compression system. During normal operation, the screen frame and compression system
components accumulate residual mud that should be removed periodically. In addition, the eight
float mounts should be inspected and replaced when damage is evident. Since these components
isolate the vibratory motion of the screen frame from the stationary parts of the machine,
deterioration may occur over time. Refer to the screen frame maintenance table below for key
inspection and maintenance locations.
Summary of Contents for HYPERPOOL SHAKER
Page 2: ......
Page 8: ......
Page 16: ......
Page 20: ......
Page 34: ......
Page 44: ......
Page 56: ......
Page 84: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 90: ......
Page 91: ...DERRICK ...
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 112: ......
Page 114: ...INSTALLATION MAINTENANCE LOG 9 2 15 Jun 12 HyperPoolShaker ...
Page 115: ...INSTALLATION AND MAINTENANCE LOG 15 Jun 12 9 3 HyperPoolShaker ...
Page 116: ...INSTALLATION MAINTENANCE LOG 9 4 15 Jun 12 HyperPoolShaker ...
Page 117: ...INSTALLATION AND MAINTENANCE LOG 15 Jun 12 9 5 HyperPoolShaker ...
Page 118: ...INSTALLATION MAINTENANCE LOG 9 6 15 Jun 12 HyperPoolShaker ...