MAINTENANCE
5-4
15 Jun 12
HyperPoolShaker
SCREEN FRAME (CONT’D)
Figure 5-1. Screen Frame Inspection and Maintenance
SCREEN PANEL REPLACEMENT
Use the following procedure when changing screen panels. If installing panels for the first time,
follow only the instructions under
Installation
. Screen panel replacement is done with the installer
on the compression side of the screen frame.
Removal
1. Stop the flow of feed slurry to the feeder and desander/desilter.
2. Wash screen panel to remove residue from panel surfaces.
3. De-energize vibrator motors, and lock out and tag out electric power.
HP-704 screen bed. Note compression pins and panel locators.
4. Remove compression handle from holder, and insert into handle tube of compression
assembly.
Summary of Contents for HYPERPOOL SHAKER
Page 2: ......
Page 8: ......
Page 16: ......
Page 20: ......
Page 34: ......
Page 44: ......
Page 56: ......
Page 84: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 90: ......
Page 91: ...DERRICK ...
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 112: ......
Page 114: ...INSTALLATION MAINTENANCE LOG 9 2 15 Jun 12 HyperPoolShaker ...
Page 115: ...INSTALLATION AND MAINTENANCE LOG 15 Jun 12 9 3 HyperPoolShaker ...
Page 116: ...INSTALLATION MAINTENANCE LOG 9 4 15 Jun 12 HyperPoolShaker ...
Page 117: ...INSTALLATION AND MAINTENANCE LOG 15 Jun 12 9 5 HyperPoolShaker ...
Page 118: ...INSTALLATION MAINTENANCE LOG 9 6 15 Jun 12 HyperPoolShaker ...