The final correctly installed nickel-chromium wire
This concludes installation of the nickel-chromium wire in the release mechanism.
3. Installing/Changing the Batteries of an ARC Station
You have two options powering your Acoustic Release Control (ARC) station.
Please note that your ARC units will come pre-loaded with a standard alkaline battery configuration.
STANDARD OPTION
With the maximum total life time of
130 days
, consists of eight (8), 1.5 volt ‘AA’ size batteries
installed in two packs of four (4):
●
Total number of batteries: eight (8);
Summary of Contents for Acoustic Release Control System
Page 3: ......
Page 25: ......
Page 33: ... Control Panel Device Manager Ports COM LPT ...
Page 35: ......
Page 44: ...STEP 6 Click Continue button The ARC unit will be added to the main window s list ...
Page 62: ......