Rev 07/04/2015
44
4.5. REPLACING THE EVAPORATOR FAN
a) Remove the screws that mount the fan guard.
b) Unscrew the finger guard, open the panel and unscrew the motor fan
a) Remove the fan/motor assembly.
b) Remove the fan wires from the terminal block.
c) Cut the wires close to the motor.
d) Mount the fan to the brace with four screws.
e) Attach the end of the wires of the fan to the old wires and pull the wires from the
control compartment to route them correctly.
f) Remove the old wires.
g) Connect the wires to the terminal block.
h) Close the panel.
i) Reinstall the fan guard.
4.6. REPLACING THE DOOR SWITCH
4.6.1 GBF-3GN2/3 (smallest self-contained unit)
a) Remove the front panel (see page 23).
b) Remove door switch mounting screws.
c) Disconnect the switch wires from terminals 48 & 49 on the main control.
d) Remove the switch.
e) Reinstall new switch by reversing the above steps
4.6.2 Units from 5 up to 18 shelves
a) Remove the front panel (see page 23).
Summary of Contents for GBC-15
Page 1: ...Service Manual Blast Chiller...
Page 2: ...Rev 07 04 2015 2...
Page 3: ...Blast chiller Service Manual 3 Rev 07 04 2015...
Page 32: ...Rev 07 04 2015 32...
Page 40: ...Rev 07 04 2015 40...
Page 50: ...Rev 07 04 2015 10 20 10 0 10 20 30 40 kOhms C kOhmsVsTempChart NTC 10kOhms 25 C ZOOM...
Page 57: ...Blast chiller Service Manual 17 Rev 07 04 2015 L1 L2...
Page 91: ...Blast chiller Service Manual 51 Rev 07 04 2015 6 SCHEMATICS 6 1 SCHEME OF COMPONENTS...
Page 97: ...Blast chiller Service Manual 57 Rev 07 04 2015...
Page 100: ...Rev 07 04 2015 60...