EN
Installation
01/2020
11 / 24
How to connect the tool to CVI3 Vision
Plug the eDOCK to the tool and connect it to the USB port of the bottom panel of CVI3 Vision.
Plug a full-loaded battery pack to the tool.
See the instructions in the diagram.
Respect the connection order.
Inserting the battery pack
Insert the battery pack in front or behind the tool.
There is no ON/OFF switch: the tool is ready to operate as soon as a loaded battery pack is mounted.
When the tool is powered on, the LEDs are blinking.
Summary of Contents for EABS12-1100-10S
Page 13: ...EN Installation 01 2020 13 24 Installing the EABS front suspension swiveling bail ...
Page 22: ......
Page 23: ......