10
GB
3.3.6- Power up the panel
Do not install the control panel with the power supply connected. Always disconnect
the exterior bipolar magnetothermic switch before working in the panel.
The connection order, for your safety, must always be first the mains and then the
batteries. Do not connect the station to the mains until you have completed the start-up
3.3.6.1- Mains connection
Make the earth cable longer so that in case of abrupt removal it is the last to disconnect.
Insert the wire into the plastic guide tabs using the plastic case, to prevent the wire
coming loose in the case of sudden removal.
Never use the fuses to connect and disconnect the mains power, use the external
circuit breaker.
Summary of Contents for CCD-103
Page 1: ...GB ES ES GUIDE MANUAL FR 3 Zones Conventional fire extinguishant control panel IT ...
Page 2: ......
Page 3: ...ES ES Central Convencional de 3 Zonas de detección y 1 Extinción MANUAL DEL USUARIO ...
Page 4: ......
Page 6: ......
Page 14: ...12 ES 4 Guía de conexionado de la PCB ...
Page 44: ......
Page 45: ...GB GUIDE MANUAL 3 Zones Conventional fire extinguishant control panel ...
Page 46: ......
Page 48: ......
Page 56: ...12 GB 4 PCB connection guide ...
Page 86: ......
Page 87: ...FR FR Centrale conventionnelle à 3 zones de détection et 1 zone d extinction MODE D EMPLOI ...
Page 88: ......
Page 90: ......
Page 98: ...FR 12 4 Guide de branchement de la PCB carte de circuit imprimé ...
Page 128: ......
Page 129: ...IT Central Convencional de 3 Zonas de detección y 1 Extinción MANUAL UTENTE ...
Page 130: ......
Page 132: ......
Page 140: ...12 IT 4 Guía de conexionado de la PCB ...
Page 170: ...55310300 2014 10 14 ...