11. Si une pompe a condensat doit être utilisée,
assurez-vous qu’elle soit compatible avec le
condensat acide.
3.2.2
Downflow multiposition pressure
switch connection
The 3/16" stub just beside the drain of the condensate
box must be drilled or cut open. Use the supplied black
squared PVC tubing to connect the pressure switch (-0.2
in. w.c.) to this stub. (see figure 5)
The pressure switch must also be electrically connected
in series with the low fire pressure switch (top) using the
brown jumper provided in the parts bag. Refer to figure 4
for more details.
Figure 4 –
Downflow position pressure switch
assembly
Figure 5 – Connecting pressure switch in downflow
position
3.3
HORIZONTAL RIGHT
Figure 6 – Horizontal right position
Figure 7 – Horizontal right slope
When installing the furnace in horizontal right position,
make sure the furnace is tilted foward to make it drain
properly. Refer to figure 7.
Plan your installation and make sure you have sufficient
space for the drain trap and exhaust pipe drainage. Drain
trap will add approximately 6.50" to the furnace width.
Refer to figure 6.
3.3.1
Horizontal right condensate drain
trap connection
REFER TO FIGURE 6 FOR INSTALLATION DETAILS
1. Remove all condensate tubings from the inducer
blower and vent collector. Block the openings with
provided 5/8" and 1/2" black caps.
2. Remove the horizontal right drain trap knock-out.
10
Summary of Contents for C105-1-D
Page 24: ...Figure 26 Alternate horizontal termination C Figure 27 Venting gasket 23...
Page 25: ...Figure 28 Direct vent clearance 24...
Page 26: ...Figure 29 Other than Direct vent clearance 25...
Page 34: ...Figure 32 Single Stage PSC Wiring diagram...
Page 35: ...Figure 33 Two Stage PSC Wiring diagram...
Page 36: ...Figure 34 Single Stage ECM Wiring diagram...
Page 39: ...Figure 35 Dimensions 38...
Page 40: ...Figure 36 Exploded view CXX 1 X part 1...
Page 41: ...Figure 37 Exploded view CXX 1 X part 2...
Page 43: ...Figure 38 Exploded view Cxx 1 D part 1...
Page 44: ...Figure 39 Exploded view Cxx 1 D part 2...
Page 46: ...Figure 40 Exploded view Cxx 2 D part 1...