Figure 19 – Sidewall concentric termination
8.9.2
Two pipe termination
Maintain the required distance between vents or pairs
of vents. Cut the required number of holes in the roof
or sidewall for vent and combustion air pipes. Sidewall
holes for two pipes vent terminations should be side-by-
side, allowing space between the pipes for the elbows to
fit on the pipes. Holes in the roof for two pipe terminations
should be spaced no more than 18” (457 mm) apart.
Termination elbows will be installed after the vent and
combustion air pipe are installed.
Combustion air intake can be snorkeled to acheive 12"
min distance from expected level of snow and/or ground.
Figure 20 – Roof termination
Figure 21 – Standard horizontal termination
Figure 22 – Alternate horizontal termination A
Figure 23 – Alternate horizontal termination B
Figure 24 – Alternate horizontal termination C
22
Summary of Contents for CC15-M-V
Page 18: ...Figure 17 Wiring Diagram 18...
Page 23: ...Figure 25 Direct vent clearance 23...
Page 24: ...Figure 26 Other than Direct vent clearance 24...
Page 34: ...12 PART LIST Figure 27 Exploded view...
Page 35: ...Figure 28 Exploded view continued...
Page 36: ...Table 19 Part list Chinook Compact...
Page 37: ...Table 20 Part list continued...
Page 38: ...13 NOTES 38...
Page 39: ...39...
Page 40: ...40...