28.9.20
Fieldbus-Gateway UNIGATE
®
CX C4Map - PROFIBUS V. 1.0
27
Deutschmann Automation GmbH & Co. KG
Hardware ports, switches and LEDs CANopen (Mapping)
Whilst the device is executing a reset the CANopen
®
RUN LED shall be off.
In case there is a conflict between turning the LED on green versus red, the LED may be turned
on red. Apart from this situation, the bicolor status LED shall combine the behavior of the CAN
Error LED.
8.3.3
LED “Power“
This LED is connected directly to the (optionally also electrically isolated) supply voltage of the
serial interface (RS232/422/485).
8.3.4
LED “State“
Lights green
Data exchange active
Flashes green
Connection ok but no constant data exchange
Flashes green/red
No data exchange since switching on
Lights red
general gateway error (see LED’s Error No.)
Flashes red
UNIGATE is in configuration / test mode
8.3.5
LEDs 1 / 2 / 4 / 8 (Error No / Select ID)
If these 4 LEDs flash and LED “State“ simultaneously lights red, the error number is displayed in
binary notation (conversion table, see Annex) in accordance with the table in chapter "Error han-
dling". Additionally there LEDs are controllable via Script.
8.4 Switches
The Gateway features 4 switches with the following functions:
Rotary coding switch S4
ID High for serial interface i. e. configmode
Rotary coding switch S5
ID Low for serial interface i. e. configmode
Termination (CANopen
®
)
switchable CANopen
®
-terminating resistor
DIP-switch
Node-ID and baud rate
8.4.1
Rotary coding switches S4 + S5 (serial interface)
This value is read in when the gateway is switched on.
8.4.2
Termination (CANopen
®
)
If the Gateway is operated as the first or last physical device in the CANopen
®
, there must be a
bus termination at this Gateway. In order to do this, either a bus terminating resistor must be acti-
vated in the connector or the resistor (220
) integrated in the Gateway must be activated. In
order to do this, slide the slide switch to position ON. In all other cases, the slide switch must
remain in position OFF. Please refer to the general Fieldbus literature for further information on
the subject of bus termination.
Note: To activate or deactivate the bus termination, please remove the BUS-connector and care-
fully set the switch to the desired position.
8.4.3
DIP-Switch
The DIP-switch is used to set the Node-ID and Baud rate according to picture 3.
Blinking
PRE-OPERATIONAL The device is in the PRE-OPERATIONAL state.
On
OPERATIONAL
The device is in the OPERATIONAL state.
Summary of Contents for UNIGATE CX C4Map
Page 2: ...Handbuch Art Nr V4412E ...
Page 56: ......