17 Pictures for illustrating purposes only
1
1
1
1
660
H >
m
m
H3
H2
H1
H2
41
0
H >
m
m
19,
61
1
H3
H2
1
H1
1
1
1
H3
H2
H1
48
0
H >m
m
550
H >
m
m
1
1
1
H1
H2
H2
1
H3
27
0
H >
m
m
1
H3
8,5
1
H1
E
LECTRO
V
AP
MC2
Installation - Step 3
STEAM DISTRIBUTION PIPE POSITIONING
Please meet the following dimensions and spaces according to your configuration. For further
information, please contact
devatec
or their authorized agent.
H1 = 110mm = Minimum height between the duct floor and the axle of the steam pipe.
H2 = 140mm = Minimum distance between two pipes.
H3 = 160mm = Minimum height between the duct top and the axle of the steam pipe.
The H3 distance can be 80 mm at the shortest in case the steam pipe is installed at
an angle of 30°.
The arrow shows the direction of the air flow.