24 Pictures for illustrating purposes only
E
LECTRO
V
AP
MC2
Installation - Step 5
R
ECOMMENDATION :
All works concerned with the electrical installation must be carried out by skilled
and qualified personnel (eg electrician with appropriate training). The customer
is responsible for ensuring their suitability. Please observe local regulations
concerning the provision of electrical installations.
Check all electrical terminal screws at commissioning, after 50 hours operation
and at every service thereafter.
Take care : the ELMC electronic components are very sensitive to electrostatic
shocks. Appropriate steps must be taken before any operation.