ElectroVap®
ELMC-SB
10
3.
INSTALLATION
3.1
PROCEDURE
•
Mark and drill where indicated (holes size depends on the selected dowels and support materials).
•
Put the dowels in the holes.
•
Screw the top screws into the dowels (M6 recommended), let them protrude by about 10 mm/0.39in.
•
Hang the device to the top screws and align it vertically and horizontally with a bubble level.
•
Tighten up all 4 screws.
(*)
SC = Small Cylinder - MC= Medium Cylinder
ELMC
1 SC
(*)
ELMC
1 MC
(*)
ELMC
2 MC
(*)
ELMC
3 MC
(*)
Has: 400
450
750
1000
A1:
500
A2:
35
53
23
38
B:
400
510
510
510
B1:
81
81
81
81
Fig. 3-1.
Installation holes
Summary of Contents for ElectroVap ELMC 20-30 SB
Page 1: ...STEAM GENERATOR FOR STEAM ROOM ElectroVap ELMC SB Series Instruction Operation Manual ...
Page 25: ...ElectroVap ELMC SB 25 3 8 6 Wiring diagrams ELMC 5 to 10 Up V 1x200 240V 50 60Hz ...
Page 26: ...ElectroVap ELMC SB 26 ELMC 5 to 30 Up V 3x200 690V 50 60Hz ...
Page 27: ...ElectroVap ELMC SB 27 ELMC 40 to 60 Up V 3x200 690V 50 60Hz ...
Page 28: ...ElectroVap ELMC SB 28 ELMC 90 Up V 3x200 690V 50 60Hz ...
Page 29: ...ElectroVap ELMC SB 29 3 9 OPTION Transformer connection ...
Page 51: ...ElectroVap ELMC SB 51 ...