background image

 

HBE3 M3 LE3/LS3 Installation Leaflet 

DIL-0300-0068 

Revision - B 

 

25/04/2022 

Voltage: 220-240V / 50-60Hz 
LED Power: 1.8W 
Battery: Li-FeP04 18650 3.2V 1500mAh 
Operating Temperature: 0°C - 40°C 
IP20 

 

 
   

 

WARNING - THIS LUMINAIRE MUST BE EARTHED

 

This luminaire has been tested and is manufactured to comply with BS EN 
60598 : specification for general requirements and tests. It should be installed by 
a suitably qualified person in accordance with IEE.

 

CAUTION

: there is a potential risk of electric shock from the LED boards when 

the product is operational with the cover removed.

 

NOTE

:  INSTALLATION AND OPERATION OF THE LUMINAIRE BEYOND ITS 

SCOPE OF SUPPLY WILL INVALIDATE THE WARRANTY.

 

 

1.

 

Ceiling/Wall surface mount 

 
 
 
 
 
 
 
 
 

 

Drill a hole in the ceiling and feed the cable through. 

 

 

2.

 

 

 
 
 
 
 
 
 
 
 
 

Remove the top cover and drill the cable entry hole in 

the indicated location. 

3.

 

 

 
 
 
 
 
 
 
 
 

 

Drill two fixing holes and secure the cover in place 

with two screws.  

 

 

 

4.

 

 

 
 
 
 
 
 
 
 
 

 

Pass the cable through and wire directly into the 

terminal block. Secure the mains cable using the 

internal cable clamp. 

5.

 

 

 
 
 
 
 
 
 
 
 

 

 

Connect the battery. 

6.

 

 

 

Attach the fitting to the top cover and secure in place. 

When wall mounting, rotate the body 90 degrees and 

secure in place. 

 

BEFORE installation, the electrical supply and battery pack MUST be disconnected. 

Summary of Contents for HBE3 M3 LE3

Page 1: ...operational with the cover removed NOTE INSTALLATION AND OPERATION OF THE LUMINAIRE BEYOND ITS SCOPE OF SUPPLY WILL INVALIDATE THE WARRANTY 1 Ceiling Wall surface mount Drill a hole in the ceiling and feed the cable through 2 Remove the top cover and drill the cable entry hole in the indicated location 3 Drill two fixing holes and secure the cover in place with two screws 4 Pass the cable through ...

Page 2: ...ll two fixing holes and secure the bracket in place with two screws 4 Pass the cable through and wire directly into the terminal block Secure the mains cable using the internal cable clamp 5 Connect the battery 6 Attach the top cover to the suspended bracket and secure the fitting in place 1 Side mounted Drill a hole in the ceiling and feed the cable through 2 Remove the top cover and drill the ca...

Page 3: ...nal cable clamp 5 Connect the battery 6 Attach the top cover to the side bracket and secure the fitting in place 1 Recessed Make a cut out in the ceiling using the dimensions pictured 2 Remove the top cover and drill the cable entry hole in the indicated location 3 Pass the cable through and install the recessed bracket 4 Pass the cable through and wire directly into the terminal block Secure the ...

Page 4: ...attery failure Red indicator once every 3 seconds Lighting source failure Red indicator twice every 3 seconds Less than rated duration time Red indicator three times every 3 seconds 8 Self Test LS3 only Every month the luminaire will undergo an automatic test which lasts for 10 minutes An annual duration test will also occur for a total of 3 hours The luminaire will return to normal operation once...

Reviews: