2. INSTALLATION
Page 13
© 2008 DH Instruments, a Fluke Company
2.6
LONG TERM STORAGE, PREPARATION FOR SHIPPING
The following is recommended for long term storage and/or shipping of E-DWT-10000-AF:
E-DWT-10000-AF is designed to be shipped with its reservoir full of calibration fluid. If the instructions
below are followed carefully, it is not necessary to empty the reservoir prior to shipment.
•
IMPORTANT: Close the reservoir cover fully by rotating it CW until snug, with reservoir vent valve
aligned with CLOSE position.
•
IMPORTANT: Close the reservoir shut off valve by rotating it CW until snug.
•
IMPORTANT: Plug the TEST port.
•
Remove (by unscrewing) the four variable volume handles on the front of the E-DWT.
•
Close the test shut off valve.
•
Place the E-DWT-10000-AF in the custom shipping/storage case in which it was delivered.