PPC2+™ Operation and Maintenance Manual
Page 9
©2001 DH Instruments, Inc.
2.3.2
FRONT AND REAR PANELS
2.3.2.1
FRONT PANEL
The front panel assembly provides a 2 x 20 vacuum fluorescent display of PPC2+
operating status and a membrane keypad for local user control.
1. Multi-Function
Keypad
3. Remote
Indicator
2. Direct Pressure Control Keys
4. Display
Figure 1. Front Panel
2
3
4
Summary of Contents for PPC2+
Page 1: ... 2001 DH Instruments Inc q 9ZO K SYX KXN 7KSX OXKXMO 7KX_KV ...
Page 14: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 6 8 89 9 ...
Page 24: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 16 8 89 9 ...
Page 84: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 76 8 89 9 ...
Page 132: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 124 8 89 9 ...
Page 150: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 142 8 89 9 ...
Page 156: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 148 8 89 9 ...
Page 166: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 158 8 89 9 ...