PPC2+™ Operation and Maintenance Manual
Page i
©2001 DH Instruments, Inc.
>
>
+
+
,
,
6
6
/
/
9
9
0
0
-
-
9
9
8
8
>
>
/
/
8
8
>
>
=
=
TABLE OF CONTENTS ................................................................................ i
TABLES ................................................................................................... iv
FIGURES .................................................................................................. v
ABOUT THIS MANUAL .............................................................................. vi
1.
INTRODUCTION .................................................................................... 1
1.1
PRODUCT OVERVIEW............................................................................................................................. 1
1.2
SPECIFICATIONS..................................................................................................................................... 2
1.2.1
GENERAL SPECIFICATIONS ....................................................................................................................... 2
1.2.2
PRESSURE MEASUREMENT SPECIFICATIONS ........................................................................................ 2
1.2.2.1
REFERENCE PRESSURE TRANSDUCER (RPT) SPECIFICATIONS .......................................... 3
1.2.2.2
ON-BOARD BAROMETER.............................................................................................................4
1.2.3
PRESSURE CONTROL SPECIFICATIONS................................................................................................... 4
1.2.4
ANALOG INPUT SPECIFICATION ................................................................................................................ 5
2.
INSTALLATION ..................................................................................... 7
2.1
UNPACKING AND INSPECTION.............................................................................................................. 7
2.1.1
REMOVING FROM PACKAGING .................................................................................................................. 7
2.1.2
INSPECTING CONTENTS ............................................................................................................................. 7
2.2
SITE REQUIREMENTS ............................................................................................................................. 8
2.3
INITIAL SETUP ......................................................................................................................................... 8
2.3.1
PREPARING FOR OPERATION.................................................................................................................... 8
2.3.2
FRONT AND REAR PANELS ........................................................................................................................ 9
2.3.2.1
FRONT PANEL .............................................................................................................................. 9
2.3.2.2
REAR PANEL ASSEMBLY .......................................................................................................... 10
2.3.3
POWER CONNECTION ............................................................................................................................... 10
2.3.4
CONNECTING TO A PRESSURE SUPPLY (SUPPLY PORT) .................................................................... 11
2.3.5
CONNECTING A VACUUM PUMP (EXHAUST PORT) ............................................................................... 11
2.3.6
CONNECTING TO THE DEVICE UNDER TEST (TEST AND TEST(-) PORTS) ...................................................... 11
2.3.6.1
INSTALLING THE SPLT .............................................................................................................. 12
2.3.7
THE VENT CONNECTION (VENT PORT) ................................................................................................... 13
2.3.8
THE ATM REF PASS THROUGH (UNLABELED) ....................................................................................... 13
2.4
POWER-UP AND VERIFICATION .......................................................................................................... 13
2.4.1
SWITCH POWER ON................................................................................................................................... 13
2.4.2
CHECK PROPER PRESSURE MEASUREMENT OPERATION.................................................................. 14
2.4.2.1
CHECKING ABSOLUTE MODE PRESSURE MEASUREMENT .................................................. 14
2.4.2.2
CHECKING GAUGE MODE PRESSURE MEASUREMENT ........................................................ 14
2.4.3
LEAK CHECK .............................................................................................................................................. 14
2.4.4
PURGE ........................................................................................................................................................ 15
2.4.5
CHECK PROPER PRESSURE CONTROL OPERATION ............................................................................ 15
2.5
SHORT TERM STORAGE ...................................................................................................................... 15
3.
OPERATION........................................................................................ 17
3.1
GENERAL/MANUAL OPERATION......................................................................................................... 17
3.1.1
MAIN RUN SCREEN.................................................................................................................................... 17
3.1.2
GENERAL OPERATING PRINCIPLES........................................................................................................ 18
3.1.2.1
MAIN 4 X 4 KEYPAD LAYOUT AND PROTOCOL ....................................................................... 18
3.1.2.2
DIRECT PRESSURE CONTROL KEYS....................................................................................... 19
3.1.2.3
AUTOMATED PRESSURE CONTROL ........................................................................................ 20
3.1.2.4
PRESSURE READY (<*>)/NOT READY (<
↑
> OR <
↓
>) ............................................................... 22
Summary of Contents for PPC2+
Page 1: ... 2001 DH Instruments Inc q 9ZO K SYX KXN 7KSX OXKXMO 7KX_KV ...
Page 14: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 6 8 89 9 ...
Page 24: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 16 8 89 9 ...
Page 84: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 76 8 89 9 ...
Page 132: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 124 8 89 9 ...
Page 150: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 142 8 89 9 ...
Page 156: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 148 8 89 9 ...
Page 166: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 158 8 89 9 ...