Raise the platform (by hoist, overhead gantry crane, fork lift etc.) and position it above the lift arms. Align the platform hands with
the holes in the lift arms, and mount the pins in the same way as originally supplied on the platform. [Figure 10.3 - Figure 10.4]
Tilt the platform open to 45° angle. Align the hole in the tilt cylinders with the hole in the platform hands by means of the electrical
controls, or manually [see procedure above]. Mount the pins and rollers in the same way as originally supplied on the platform
[Figure 10.3 - Figure 10.4].
open
close
Figure 10.2
Figure 10.3
Figure 10.4
Summary of Contents for DH-LM Series
Page 11: ...10 DHOLLANDIA 1 2 9 8 11 2 13 4 7 11 5 v 3 v 10 Figure 6 1 14 6 v...
Page 13: ...12 DHOLLANDIA Figure 6 2 MTG MFT...
Page 27: ...26 DHOLLANDIA Figure 9 6...
Page 34: ...33 DHOLLANDIA Figure 9 15...
Page 42: ...41 DHOLLANDIA EX EX Figure 11 9 Figure 11 10...
Page 46: ...45 DHOLLANDIA Figure 14 1 EX...
Page 50: ...49 DHOLLANDIA Figure 16 2 400mm 400mm 250mm 400mm 400mm 250mm...
Page 52: ...51 DHOLLANDIA EF0583 LM EN EF0565 EN EF0620 EN EF0570 CAP serial nr EF0564 EN EF0581 EN xxxx...
Page 58: ...57 DHOLLANDIA...
Page 59: ...58 DHOLLANDIA...
Page 60: ...59 DHOLLANDIA...
Page 68: ...67 DHOLLANDIA Figure 18 4 Figure 18 5...
Page 70: ...69 DHOLLANDIA For option OAE510 15 see Figure 18 7 below Figure 18 7...